University of Winchester
BFES were able to find a comprehensive solution to a challenging project to bring new facilities, including first class catering, to the students at the University of Winchester.
The new facilities include a food hall with kitchens and serveries as well as a new student union with three bars, venue space and late night catering facilities. BFES installed high quality Swedish equipment made by Wexiodisk.
There is rarely any time when the University catering facilities are not in use as even during holiday times they are required for conferences.
This meant that when the dining hall was demolished, B F Engineering Services had to install a temporary catering outlet in an exam hall, so the students could be catered for while the new kitchens were being built.
Despite this the project was completed successfully with minimum disruption to student life at the University.
Copyright Dennis Gilbert
Bedales School
BFES were invited to undertaken the design, project management and installation of a new washing up area as part of a project to improve the dining area and servery at Bedales school in Hampshire.
An ergonomic, semi automatic, handling and sorting system was installed, which included a state of the art environmentally friendly dishwasher.
The professional dishwasher, made by Swedish manufacturer Wexiodisk, offers improved reliability and reduced cost as well as a very low impact on the environment.
The new improved system means that an improved cleaning time is achieved after each service.
No 8 Kings Road
BFES undertook a project to convert an HSBC bank into an upmarket French restaurant in Southsea.
The Company undertook the design, project management and installation of the kitchen, cold rooms and bar.
The scheme included converting the cellar into the cold rooms and kitchen. This meant that everything had to be designed to fit in with the low ceiling heights and some ingenious solutions had to be devised to get the ventilation and ducting back out of the cellar.
The dishwashers were state of the art environmentally friendly products made by Wexiodisk, a high quality Swedish manufacturer.
The bar on the restaurant floor was also designed and installed by BFES. Throughout the project, the designs had to be tailored to the unusual requirements of the building.
More Case Studies >>